G-28
Checking Slide Installation Status and Fixing
1.
Push the server into the rack once to check the installation position.
NOTE:
Make sure that the four screw holes at the upper left and right sides on the front of
the server are fit to the core nuts. If the four positions are not fit at all, the slide rail
assembly or the core nuts may be installed incorrectly. If so, the adjacent units cannot be
installed without clearance. Confirm the installation positions and make the reinstallation
from the first step.
2.
Pull out or push the server into the rack for several times to confirm that the slides move smoothly.
3.
Connect the power cords and all interface cables to the server.
IMPORTANT:
When routing the cable, pay attention that the cables are not caught, bent,
or loose when sliding the server.
4.
Fix the server to the rack with four screws (B) and four washers (A) after making sure the positions of core
nuts.
Summary of Contents for Express5800 140He
Page 1: ... User s Guide Express5800 140He ...
Page 2: ......
Page 4: ...This page is intentionally left blank ...
Page 18: ...x This page is intentionally left blank ...
Page 62: ...2 32 This page is intentionally left blank ...
Page 266: ...8 56 This page is intentionally left blank ...
Page 336: ...B 6 This page is intentionally left blank ...
Page 362: ...E 12 This page is left intentionally blank ...
Page 378: ...G 12 ...
Page 397: ......
Page 398: ... ...