G-8
STEP 3
TURNING SERVER POWER OFF
Turn off the power of the server in the following procedure:
1.
Schedule the jobs required to convert the server configuration for the tower model to that for the rack mount
model (if the server has already been used in the configuration for the tower model).
2.
Back up the important data saved in the server using the procedure defined by the server OS (if the server has
already been used in the configuration for the tower model).
IMPORTANT:
Before starting the conversion of the server configuration for the tower
model to that for the rack mount model (or vise versa), back up the important data saved in
the server.
3.
Set the server to the offline status using the procedure defined by the network OS (if the server has already
been used in the configuration for the tower model).
4.
Release the key lock on the front door and open the front door.
Summary of Contents for Express5800 140He
Page 1: ... User s Guide Express5800 140He ...
Page 2: ......
Page 4: ...This page is intentionally left blank ...
Page 18: ...x This page is intentionally left blank ...
Page 62: ...2 32 This page is intentionally left blank ...
Page 266: ...8 56 This page is intentionally left blank ...
Page 336: ...B 6 This page is intentionally left blank ...
Page 362: ...E 12 This page is left intentionally blank ...
Page 378: ...G 12 ...
Page 397: ......
Page 398: ... ...