
Barracuda PDA Maintenance
111
7.6.2.1 IrDA
Test equipment: another Pocket PC device.
Sub Menus:
1. Master
2. Slave
3. Exit
Purpose: Verify the IrDA transmit and receive function.
Test Method: The IrDA will transmit a fixed header and wait for receiving the header, and it will display the IrDA
test: Pass or Fail; and should prevent the PDA holding when no transmittal occurs.
Leave method: Record button.
---Provide for IrDA test as below.
1. If test is OK, system will show “Pass” on message display area.
2. If test is failed, system will show “Fail” on message display area.
Summary of Contents for Barracuda
Page 5: ...Barracuda PDA Maintenance 4 Block Diagram ...
Page 6: ...Barracuda PDA Maintenance 5 Power Block Diagram ...
Page 18: ...Barracuda PDA Maintenance 17 Typical Audio Amplifier Application Circuit ...
Page 24: ...Barracuda PDA Maintenance 23 Block diagram of the 10 bit ADC circuit ...
Page 26: ...Barracuda PDA Maintenance 25 BLOCK DIAGRAM ...
Page 28: ...Barracuda PDA Maintenance 27 Block Diagram ...
Page 30: ...Barracuda PDA Maintenance 29 GENERAL SPECIFICATIONS ABSOLUTE MAXIMUM RATINGS ...
Page 33: ...Barracuda PDA Maintenance 32 ...
Page 42: ...Barracuda PDA Maintenance 41 ...
Page 43: ...Barracuda PDA Maintenance 42 ...
Page 45: ...Barracuda PDA Maintenance 44 FUNCTIONAL BLOCK DIAGRAM ...
Page 47: ...Barracuda PDA Maintenance 46 Strata Flash Memory Block Diagram ...
Page 54: ...Barracuda PDA Maintenance 53 DS2760 Block Diagram ...
Page 151: ......
Page 152: ......