Connecting a System Directly to Two Separate Power Sources
Electrical (AC) Power Planning
4-5
Connecting a System Directly to Two Separate Power Sources
If you do not connect your Express5800/320Fc system or PDUs to a UPS, provide
two AC power sources that are as electrically independent of each other as the
installation site allows. At a minimum, the two power sources must be powered by
separate circuit breakers (maximum of 20A) to AC power and, if possible, be
independent of each other beyond that level. The more electrical separation between
the two power sources, the less likely they will both fail at the same time. Due to
redundancy in Express5800/320Fc systems, power to either side of the system keeps
the system in operation, although the system is no longer fault-tolerant with regard
to power.
Figure 4-1
shows how to connect a pedestal system directly to two separate power
sources.
Table 4-7. Worksheet: A-Side External Power Outlet Requirements - No PDUs
Component
Quantity
Outlets
Subtotal
Express5800/320Fc systems
x
1
TOTAL NUMBER OF A-SIDE POWER OUTLETS
Table 4-8. Worksheet: B-Side External Power Outlet Requirements - No PDUs
Component
Quantity
Outlets
Subtotal
Express5800/320Fc systems
x
1
TOTAL NUMBER OF B-SIDE POWER OUTLETS
Summary of Contents for Active Upgrade Express5800/320Fc
Page 1: ...NEC Corporation of America 456 01723 000 Express5800 320Fc Site Planning Guide ...
Page 10: ...Preface x Express5800 320Fc Site Planning Guide ...
Page 17: ...System Documentation 1 7 page intentionally left blank Express5800 320Fc Site Planning Guide ...
Page 59: ...Standards Compliance Standards Compliance C 3 VCCI Note BSMI Note ...
Page 60: ...Standards Compliance C 4 Express5800 320Fc Site Planning Guide ...