Electrical (AC) Power Planning
4-1
Chapter 4
Electrical (AC) Power Planning
4-
For information about planning appropriate AC electrical power for your
Express5800/320
Fc
system, see:
•
“Redundant Power Sources” on page 4-1
•
“AC Power Service Requirements” on page 4-2
•
“Power Outlet Requirements” on page 4-4
•
“Connecting a System Directly to Two Separate Power Sources” on page 4-5
•
“NEC-Supplied Power Cords” on page 4-6
Related Topics
•
Chapter 5, “UPS Planning”
Redundant Power Sources
Express5800/320
Fc
systems require at least two separate and independent AC
power sources–an
A-side
power source and a
B-side
power source–that provide
power to the system’s power receptacles, labeled, respectively, A and B. Either
source
must be capable of continuing to provide power if power to the other source is lost.
The A-side power source provides power to components that do not require two
sources of power: a KVM switch. If you use an uninterruptible power supply (UPS), the
UPS is the A-side power source.
The B-side power source provides power to the other side of each system.
The wattage required from the A-side power source will always be equal to or greater
than the wattage required from the B-side power source.
Summary of Contents for Active Upgrade Express5800/320Fc
Page 1: ...NEC Corporation of America 456 01723 000 Express5800 320Fc Site Planning Guide ...
Page 10: ...Preface x Express5800 320Fc Site Planning Guide ...
Page 17: ...System Documentation 1 7 page intentionally left blank Express5800 320Fc Site Planning Guide ...
Page 59: ...Standards Compliance Standards Compliance C 3 VCCI Note BSMI Note ...
Page 60: ...Standards Compliance C 4 Express5800 320Fc Site Planning Guide ...