![NCR 7360-K068 Kit Instructions Download Page 25](http://html1.mh-extra.com/html/ncr/7360-k068/7360-k068_kit-instructions_4537285025.webp)
22
7360-K068 Tri-Light/Lane Light with Camera Assembly and
Lane Light Label
Routing Tri-Light/Lane Light Cable
To route the Terminal Display cables in the Full Recycling (Fixed) unit, follow these
steps:
1. Do the following:
a. From the Tower Frame pole duct, route the Tri-Light/Lane Light cable down
through the built-in hooks inside the Tower Frame.
b. Route the cable down the Scanner Bucket floor. Use cable ties to secure the cable
on bridge lances.
c. Secure the cable to the anchor using a cable tie.