62
Ovation Installation
b. Feed through the pre-installed OPTIC 5 DC Wiring Cable from the PSU assembly
into the indicated opening on the Tamper Prevention Plate. Plug in the power
cable and reinstall the security cover with the two 3mm Hex Screws previously
retained.
4. Plug in the Data and Network cables and attach the Grounding Cable.
a. Plug the open end of the Red Cat5e Data Cable (the one that was plugged into
terminal RS232-1 for Side A; RS232-2 for Side B) into the OPT Ethernet terminal
labeled as “IOIOI.”
Summary of Contents for 6001-0012-8801
Page 10: ...x...
Page 16: ...4 Deinstallation 3 Open the dispenser...
Page 18: ...6 Deinstallation...
Page 29: ...Deinstallation 17 b pull out the security bolt and retain...
Page 71: ...Ovation Installation 59...
Page 78: ...66 Ovation Installation 3 Attach the grounding cable 497 0513215 to the back cover...