52
Ovation Installation
a. Unplug the AC Power In cable from the AC Distribution board.
Note:
To identify the AC in cable, trace it back to the conduit into the dispenser
cabinet.
b. Plug in the AC Power In cable to the Power Cable Harness.
c. Plug in the Power Cable Harness to the AC Distribution board.
Summary of Contents for 6001-0012-8801
Page 10: ...x...
Page 16: ...4 Deinstallation 3 Open the dispenser...
Page 18: ...6 Deinstallation...
Page 29: ...Deinstallation 17 b pull out the security bolt and retain...
Page 71: ...Ovation Installation 59...
Page 78: ...66 Ovation Installation 3 Attach the grounding cable 497 0513215 to the back cover...