17
5
4. Remove the bad SIMM from the socket indicated and rerun the
memory test to confirm that the remaining memory is good.
5. Add a new SIMM, and rerun the memory test to confirm that the
newly installed SIMM is good.
6. Exit from the test and return to the Boot Monitor by typing:
Enter test type?
Q <CR>
7. Reset the terminal by typing:
>
rs <CR>
For information about the Boot Monitor commands, refer to
NCDware
software documentation
.