□ All machine facility and parts in use should be included in "PART LIST."
□ Proper support equipment and consumable goods are always reserved.
□ When heavy parts are transported by a crane or forklift, safety check must be
done in advance. Whether or not the parts are too heavy to transport should be
checked and an operator watch out any worker under the cargo.
□ While transporting the machine in accordance with the instruction of the manual,
the evenness of the floor and hardness of the material should be checked in
advance to prevent any accident.
□ For fire safety, automatic sprinkler systems, automatic extinguisher,
or hydrant should be installed around equipment.
Z
Summary of Contents for HTM-3788LDi
Page 1: ...o Gh Gz Gz Gt G HTM 3788 LD v Gt GO P ...
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ... ͿΠΫΫΝΖ ΠΧΖΞΖΟΥ Ϳ ΒΣΥ ...
Page 34: ......
Page 35: ......
Page 36: ... Ά ΠΝΝΖΣ ΒΣΥ ...