Navini Networks, Inc.
Ripwave Base Station I&C Guide
Part #40-00047-00 Rev D v1.0
41
February 28, 2003
Ground Requirements for the Base Station
The Base Station requires an earth ground connection. This ground should exhibit a maximum of
five ohms across true ground.
NOTE
: The installation procedures, which begin next, follow the same order as shown in
the I&C Flowchart in Figure 2.
An example of a Base Station drawing for a particular site is provided in
Appendix P
.
An example of a written Statement of Work (SOW) and Responsibility Assignment Matrix
(RAM) for installation and commissioning are provided in
Appendices Q
and
R
. This type of
document may be used in negotiating work between companies and contractor services.