Ripwave Base Station I&C Guide
Part #40-00047-00 Rev D v1.0
25
February 28, 2003
Figure 2: I&C Process Flowchart, cont’d.
Click here to link to Appendix F.
11b-Perform local “wireline”
CPE test
9b-Perform Base Station calibration
Verify and record measurements on the
Base Station Calibration Verification Form
.
10-Pass
calibration
verification
?
11a-Perform system
troubleshooting procedures
No
Yes
A
13-Perform local over-the-air
(OTA) CPE test
12-Wireline
CPE test
pass
?
No
Yes
14-OTA
CPE test
pass
?
No
Yes
B
Appendix F:
Base Station
Calibration
Verification
Form
11b-Perform local “wireline”
CPE test
9b-Perform Base Station calibration
Verify and record measurements on the
Base Station Calibration Verification Form
.
10-Pass
calibration
verification
?
11a-Perform system
troubleshooting procedures
No
Yes
A
13-Perform local over-the-air
(OTA) CPE test
12-Wireline
CPE test
pass
?
No
Yes
14-OTA
CPE test
pass
?
No
Yes
B
Appendix F:
Base Station
Calibration
Verification
Form