
Ripwave Base Station I&C Guide
Navini Networks, Inc.
2
Part #40-00047-00 Rev D v1.0
February 28, 2003
About This Document
Purpose
This document provides a Navini-certified Installation & Commissioning Technician with
instructions to properly install the Base Transceiver Station, Radio Frequency Subsystem, and
cabling; and to test and commission the Base Station after installation.
Revision History
Date
Revision/Version Authors
Editors
Comments
2001 A/1.0
J.
Price
C. Keltner
A. Chua
P. Blain
J. Coulson
D. Karina
K. Sharp
L. Hoffman
N/A Draft
4.02 B/v1.0
Same
N/A
Preliminary
8.30.02
C/1.0
Same
N/A
Prepare for release 1.16
9.3.02
C/1.0
Same
S. Redfoot
Review comments from class 8.30.02
9.27.02
C/1.0
Same
Same
Preliminary Commercial Release 1.18
10.18.02 C/1.0
Same
Same
Feedback on forms and specifications
2.7.03
D/1.0
Same
Same
Combined all Base Station I&C into one
manual; Preliminary 1.19
2.28.03
D/1.0
Same
Same
Standard Release 1.19
Contacts
Contact Navini Networks Technical Support during normal business hours: Monday through
Friday 8:30 a.m. to 5:30 p.m. Central Time. You can also submit questions or comments by web
or email at any time.
Corporate Headquarters:
(972) 852-4200
Technical Support:
1-866-RIPWAVE
Web Address:
www.navini.com
/ select Technical Support
E-mail: [email protected]
Navini Networks, Inc.
2240 Campbell Creek Blvd.
Suite 110
Richardson, Texas 75082
USA