About the Boiler 19
1.7 Installation Procedure
The flow diagram below provides a step-by-step description of the recommended procedure for clear, easy installation of the NCN LSWE
boiler in its final location. A detailed description is given of the procedure in the sequenced sections below:
Wall-mounting
»
Gas connection
»
Electrical connections
»
DIP switch settings
»
Final check
»
Water and condensate
pipe connection
»
Flue gases exhaustion
system installation
(if necessary)
»
Gas changeover
(if necessary)
»
Boiler operation
»
p. 20
p. 23
p. 27
p. 37
p. 36
p. 40
p. 41
p. 30
p. 51