Connecting the Gas Supply 27
5.1 Gas Pipe Material
WARNING
The boiler
m
ust be left running for 10
m
inutes before
checking the gas pressure, to obtain ther
m
al e
q
uilibriu
m
.
The gas installation pipes
m
ust be
m
ade of suitable
m
aterials
and co
m
ply with the applicable legislation to this respect.
The gas connection
m
ust be
m
ade using a rigid pipe, inserting a
shut-off valve between the boiler and the pressure regulator.
All the pipes
m
ust be suitably fixed in place.
5.2 Propane Gas Installations (LPG)
DANGER
Ɣ
Thoroughly check the seal and the drainage of the entire
installation, as a gas leak could cause serious da
m
age.
Ɣ
I
f a propane-fired boiler is installed in an interior roo
m
or co
m
part
m
ent underground, one side of the building
m
ust be open to the exterior.
Ɣ
I
f a gas tank is used, it
m
ust be installed in a cool,
shaded place away fro
m
direct sunlight.
I
t
m
ust also
be thoroughly secured to prevent it fro
m
tipping over,
which could cause an explosion.
I
f the boiler is used with propane, a gas regulator suitable for this
type of gas
m
ust be installed. The connection and installation
m
ust be
m
ade in accordance with the applicable regulations
and standards at the ti
m
e of installation.
Note
The output pressure of the pressure regulator
m
ust be
in accordance with Standard EN 437.
5.3 Measuring the Inlet Gas Pressure
WARNING
The boiler cannot function properly without sufficient inlet
gas pressure.
M
easuring the inlet gas pressure should be
perfor
m
ed by a licensed professional only.
The inlet gas pressure
m
ust be
m
aintained between 17
m
bar
and 25
m
bar for natural gas and between 25
m
bar and 35
m
bar
for li
q
uefied propane.
To
m
easure the inlet gas pressure:
1. Shut off the
m
anual gas valve on the gas supply line.
Gas Valve
O
pened
Closed
2.
O
pen a hot water faucet. The boiler should turn on and the
gas in the gas supply line will be purged.