background image

01

PREPARATION

01

03

CONTENTS

PREPARATION

OPERATING INSTRUCTIONS (DRILL DRIVEN)

OPERATING INSTRUCTIONS (MANUAL)

MAINTENANCE

APPLICATION

OPERATING INSTRUCTIONS 

(

DRILL DRIVEN)

-

  Make  sure  flaring  cone  is  at  the  upper  most  

position by turning flaring yoke counterclockwise.

-

  Turn  tension  rod  counterclockwise  until  it  is 

backed away from the inner chamber of the flaring 
body.

-

  Lightly  lubricate  flaring  cone  with  vacuum  pump 

oil.

1. Pull off the flare handle.

2. With  the  hex  screws  facing  down  on  the  flaring 
bar,  open  the  flaring  bar  and  insert  the  flaring  bar 
into the flaring body where the arrow is pointed.

3. Once inserted pull forward and open the flaring 
bar

Flaring Bar

 Tension Rod

Flaring Yoke 
Assembly

Tubing Depth 
Stopper

Tubing

Tubing Size

01

05

05

Step 2

Step 3

4. Place the tubing depth stopper at the right size. 
Insert  copper  tubing  up  to  the  tubing  depth 
stopper.

Flare
Handle

Hex screws

Reviews: