43
5.
Tie the length of string to the end (A) of the Data Cable at the base of
the Mast. Hold the other end of the Data Cable (B) and carefully pull it out
of the Mast so that the string extends through the length of the Mast. Untie
the string from the old Data Cable and discard the old cable.
NOTICE:
Do not crimp the HR cable (C).
6.
Tie the end of the string at the base of the Mast to one end of the
replacement Data Cable. Hold the other end of the string and carefully pull
the new Data Cable through the Mast.
NOTICE:
Do not crimp the cables.
7.
Untie the string from the Data Cable and connect the cable to the
Data Cable from the Main Frame.
.
NOTICE:
Do not crimp the cables. This step may require two people.
8.
Put the Mast back in position in the Main Frame and reinstall the
Hardware.
Note:
Do not let the cables fall down inside the Mast.
NOTICE:
Be sure not to crimp any cables. This step may require two
people.
9.
Reinstall the Mast Gasket.
10.
Connect the cables to the back of the Console and attach the
Console to the Mast with the screws from Step 2.
NOTICE:
Do not crimp the cables.
11. Final Inspection
Inspect your machine to ensure that all hardware is tight and components
are properly assembled.
Do not use until the machine has been fully assembled and
inspected for correct performance in accordance with the
Owner’s Manual.
A
B
C