0
#
component
Qty
57 6” Pulley
1
58 4 1/2” Pulley
4
60 Low Pulley Cover
2
71 #3 Pec Fly cable 150.5”L
1
82 Hex Bolt - 3/8” x 2”L
3
84 Hex Bolt - 3/8” x 1 1/2”L
with thread lock
2
88 Button Head Allen Screw
3/8” x 1 3/4”L
2
95 3/8” Flat Washer
12
97 3/8” Lock Nut
5
Step 12 Components:
Procedure:
ASSEmBLY
STEP 12
a.
Attach two 4 1/2” Pulleys (58) to the Pec Fly Pulley Bracket (37). Attach two 4 1/2” Pulleys (58) to
either side of the Leg Extension Frame (8) using the Low Pulley Cover (60) and the hardware
shown. Note the orientation of the Low Pulley Cover. Attach 6” Pulley (57) to the lower hole of the
Double Floating Pulley Bracket (61) using the hardware shown. Tighten all hardware securely.
B.
Attach Cable #3 (71) termination to the left Pec Fly Cam (18) using the hardware shown. Be sure
to place the groove on the termination bracket against the Pec Fly Cam as shown in Detail A.
Tighten hardware securely
c
. Draw Cable #3 (71) around the left pulley in the Pec Fly Pulley Bracket (37) as shown. Proceed by
looping the cable around the pulley on the left side of the Leg Extension Frame (8) as shown.
Be sure that the Low Pulley Cover does not interfere with the cable.
D.
Loop Cable #3 (71) around the 6” Pulley in the Double Pulley Bracket (61) as shown. Proceed by
looping the cable around the pulley on the right side of the Leg Extension Frame (8) as shown.
Be sure that the Low Pulley Cover does not interfere with the cable.
e.
Draw Cable #3 (71) around the right pulley in the Pec Fly Pulley
Bracket (37) as shown and attach the cable termination to the right Pec Fly Cam (18) using the
hardware shown. Be sure to place the groove on the termination bracket against the Pec Fly
Cam as shown in Detail A. Tighten hardware securely. NOTE: If
the cable termination does not reach the connection hole on the Pec Fly Cam, adjust the Pulleys
(58) in the Double Floating Pulley Brackets (61) to increase cable length.