![Nautel NX3 Installation Manual Download Page 48](http://html1.mh-extra.com/html/nautel/nx3/nx3_installation-manual_711214048.webp)
NX5/NX3 INSTALLATION MANUAL
COMMISSIONING TASKS
PAGE 2.8.6
VERSION 3.1 2021-04-22
5.
Set the active preset’s power output to 500 W as follows:
Go to the front panel UI’s
Main Menu
->
Edit Presets
menu. Scroll to the “Analog AM 0W”
preset and press accept (checkmark).
Select the Output Power sub-menu and increase the output power to 500 W. Save the change
by pressing the accept (checkmark) button. The preset is now called “Analog AM 500W*”.
Go back to the front panel UI’s
Main Menu
->
Select Preset
menu. Scroll to the “Analog AM
500W*” preset and press accept (checkmark) to activate the preset.
6.
Verify the
AM Source
is set to
Unused
using the front panel UI’s
Main Menu
->
Edit Presets ->
Audio Options -> AM Source
menu.
7.
Press the front panel’s
RF On
button
.
Its integral status LED will turn amber.
8.
Check the output of the +48 V power supply using the front panel UI’s
Main Menu
->
View
Status -> View Meters -> Rack
menu.
9.
If you wish to remotely control the transmitter via a network or directly through a laptop, use the
front panel UI to configure your network parameters. See
“Network Setup” on page 2.8.10
for
detailed information.
NOTE
: If you are not using a network, see
“Network Setup” on page 2.8.10
and manually set the IP address to 0.0.0.0. This disables the “Host Network Down” alarm.
10. Check for alarms using the front panel UI’s
Main Menu
->
View Status
->
View Alarms
screen.
11. Increase the power to the desired setpoint (use the method in
voltage. Ensure the PA voltage remains within ±10% of the following calculated value:
12. Check the reflected power level. It should be near 0 W.
13. Check for alarms using the
View Alarms
screen.
14. Set up your desired presets using the
Main Menu
->
Edit Presets
menu, noting you can create up
to 62 presets. See the “Operating the Transmitter” section of the NX5/NX3 Operations &
Maintenance Manual for detailed information.
Summary of Contents for NX3
Page 2: ......
Page 4: ......
Page 8: ...NX5 NX3 INSTALLATION MANUAL PAGE 2 VIII VERSION 3 1 2021 04 22...
Page 32: ...NX5 NX3 INSTALLATION MANUAL ADJUSTING THE SPARK GAP PAGE 2 5 4 VERSION 3 1 2021 04 22...
Page 54: ...NX5 NX3 INSTALLATION MANUAL COMMISSIONING TASKS PAGE 2 8 12 VERSION 3 1 2021 04 22...
Page 58: ...NX5 NX3 INSTALLATION MANUAL PARTS AND TOOLS PAGE 2 9 4 VERSION 3 1 2021 04 22...
Page 69: ......