SECTION 1.2: PRE-INSTALLATION TASKS
This section provides a list of tasks that you must perform prior to delivery and installation of the VX
series transmitter.
Preparing for Installation
To prepare for installation of an VX series transmitter, perform the following tasks:
1.
Ensure that the correct transmitter configuration is ordered. Check the ac power requirements,
preset frequency, and other options. If your ac power source is different than the factory
configuration (See
for example), contact Nautel to arrange
reconfiguration.
NOTE
:
For VX150, VX300 and VX600 transmitters, the ac input voltage range is 90 - 265 V ac. For VX1,
VX1.5 and VX2 transmitters, RF output power is limited to approximately 33% of rated power when the
ac input voltage is between 90 - 185 V ac
.
2.
Select a location for the transmitter in the transmitter room. Determine whether additional
heating, ventilating or cooling capacity is needed at the site. Identify any special requirements
regarding air flow around the cabinet (for example, ducting hot air away from the cabinet, or
bringing in external cooling air).
3.
If this is an upgrade or replacement transmitter (that is, if the site is already set up for a
transmitter), proceed to
. If you are upgrading a site, verify the feedline, the lightning
protection systems, and the ac power service.
NOTE
:
Be aware of lightning protection issues when installing ac power and RF feedline. Lightning
protection is essential to protect both personnel and equipment at your site. Refer to the Lightning
Protection section of Nautel’s Recommendations for Transmitter Site Preparation Manual
.
4.
Install the ac power service into the planned transmitter location, and select a location for the ac
surge protection panel (if purchased) near the transmitter. Consult with an electrician prior to
receiving the transmitter regarding local electrical codes and special considerations based on
transmitter power consumption and requirements. For detailed information, see
5.
Install lightning protection on the antenna tower. Refer to the
Recommendations for Transmitter
Site Preparation Manual
, provided with the transmitter.
WARNING! FAILURE TO COMPLY WITH RECOMMENDATIONS MAY VOID
YOUR MANUFACTURER’S WARRANTY. FOR MORE INFORMATION, REVIEW
YOUR WARRANTY DOCUMENTS.
Summary of Contents for NARF79
Page 2: ......
Page 4: ......
Page 10: ...VX150 TO VX2 INSTALLATION MANUAL PAGE VIII VERSION 0 3 2021 01 14...
Page 14: ...VX150 TO VX2 INSTALLATION MANUAL PAGE XIV VERSION 0 3 2021 01 14...
Page 22: ...VX150 TO VX2 INSTALLATION MANUAL PAGE XXII VERSION 0 3 2021 01 14...
Page 26: ...VX150 TO VX2 INSTALLATION MANUAL DESCRIPTION PAGE 1 1 4 VERSION 0 3 2021 01 14...
Page 36: ...VX150 TO VX2 INSTALLATION MANUAL ELECTRICAL REQUIREMENTS PAGE 1 5 4 VERSION 0 3 2021 01 14...
Page 38: ...VX150 TO VX2 INSTALLATION MANUAL RF OUTPUT REQUIREMENTS PAGE 1 6 2 VERSION 0 3 2021 01 14...
Page 42: ...VX150 TO VX2 INSTALLATION MANUAL PROGRAM INPUTS PAGE 1 7 4 VERSION 0 3 2021 01 14...
Page 44: ......
Page 54: ...VX150 TO VX2 INSTALLATION MANUAL CONTROL AND MONITOR WIRING PAGE 1 8 10 VERSION 0 3 2021 01 14...
Page 74: ...VX150 TO VX2 INSTALLATION MANUAL PARTS AND TOOLS PAGE 1 12 4 VERSION 0 3 2021 01 14...
Page 84: ...VX LP INSTALLATION MANUAL LIST OF TERMS PAGE 1 14 2 VERSION 0 3 2021 01 14...
Page 85: ......