24
B
o
tt
o
m
S
ec
tion #
27
85
0
Top
S
ec
tion #
27
8
56
Align pin and tap into
place with a hammer un-
til centered.
Attach Pulley Assembly
with bolt and locknut as
shown below.
Top Section Assembly
Instructions
Bottom Section Assembly
Instructions
1) First Attach Rope Cleat with the two screws found
in the bag.
2) Lower Pre-assembled Pole Clamp until it aligns
with the first ring on the pole. Tighten the lower
portion until it’s secure on the pole.
Lowe
r
P
ol
e
C
la
mp
t
o
firs
t
ri
ng
Note: Top
of pole will
protrude
halfway be-
tween up-
per and
lower clamp
sections.
1) Place the Pulley Assembly and tighten
with the provided bolt and lock nut
2) Align Spring Pin with second hole and tap
into place. Position the pin so both ends
extend the same distance from either
side.
Note: Leave Pulley loose on pole as it
will need to be removed later so that
the rope can be threaded through.
POLE ASSEMBLY INSTRUCTIONS • BOTTOM AND TOP POLE SECTIONS
Top
S
ec
tion #
27
8
56
Top
S
ec
tion #
27
8
56
B
o
tt
o
m
S
ec
tion #
27
85
0
B
o
tt
o
m
S
ec
tion #
27
85
0