![National Instruments TB-9212 Calibration Procedure Download Page 4](http://html1.mh-extra.com/html/national-instruments/tb-9212/tb-9212_calibration-procedure_3440272004.webp)
4
|
ni.com
|
TB-9212 Calibration Procedure
Building the Barrier Strip Assembly
Complete the following steps to build the barrier strip assembly.
1.
Build the barrier strip according to Figure 1.
Note
Spade-lug colors in Figure 1 are for illustration purposes only and are used to
easily differentiate chromel and constantan spade lugs.
Figure 1.
Building the Barrier Strip Assembly
2.
Place the barrier strip section in any manner of enlosed setup, or controlled environment,
to reduce the affect of air currents and rapid temperature transients.
1
Use a single thermocouple wire, spade lugs, spade-lug crimping tool, and mini thermocouple connector to
make a wire assembly. Crimp the chromel spade lugs to the chromel wire to create 8 positive spade lugs.
Crimp the constantan spade lugs to the constantan wire to create 8 negative spade lugs.
2
Use the thermocouple wire, spade lugs, and spade-lug crimping tool to make 8 wires with bare leads on
one end and the spade lugs on the other end. Crimp the chromel spade lug to the chromel wire and the
constantan spade lug to the constantan wire.
3
Assemble the barrier strips and barrier strip jackets as indicated by the manufacturer.
4a (TB-9212 with screw terminal) Connect the wire assembly with the mini thermocouple connector and
8 wires to the barrier strip.
4b (TB-9212 with mini-TC) Connect the wire assembly with the mini thermocouple connector and 8 wires to
the barrier strip.
E0–
E0+
E1–
E1+
E2–
E2+
E5–
E5+
E6–
E6+
E7–
E7+
. . .
. . .
. .
.
. .
.
– +
4
b
4
a
. . .
. . .
. .
.
. .
.
– +
–
+
–
+
–
+
–
+
–
+
–
+
+
+
–
–
E
x
–
E
x
+
E
x
–
E
x
+
1
2
3
E0– E0+
E1– E1+
E6– E6+
. . .
E7 – E7+
– +