background image

4

|

ni.com

|

NI TB-9214 Calibration Procedure

Building the Barrier Strip Assembly

Complete the following steps to build the barrier strip assembly.
1.

Build the barrier strip according to Figure 1.

Note

Spade-lug colors in Figure 1 are for illustration purposes only and are used to 

easily differentiate chromel and constantan spade lugs.

Figure 1.  

Building the Barrier Strip Assembly

1

Use a single thermocouple wire, spade lugs, spade-lug crimping tool, and mini-thermocouple connector to 
make a wire assembly. Crimp the chromel spade lugs to the chromel wire to create 16 positive spade lugs. 
Crimp the constantan spade lugs to the constantan wire to create 16 negative spade lugs.

2

Use the thermocouple wire, spade lugs, and spade-lug crimping tool to make 16 wires with bare leads on 
one end and the spade lugs on the other end. Crimp the chromel spade lug to the chromel wire and the 
constantan spade lug to the constantan wire.

3

Assemble the barrier strips and barrier strip jackets as indicated by the manufacturer.

4

Connect the wire assembly with the mini-thermocouple connector and 16 wires to the barrier strip.

+

+

E

x

E

x

+

E

x

E

x

+

E0–

E0+

E1–

E1+

E2–

E2+

E

3

E

3

+

E1

3

E1

3

+

E14–

E14+

E15–

E15+

E0– E0+

E1– E1+

E14– E14+

. . .

E15– E15+

–  + 

1

2

3

4

–  + 

. . .

. . .

. .

.

. .

.

Summary of Contents for NI TB-9214

Page 1: ...ts Software 1 Documentation 2 Test Equipment 3 Building the Barrier Strip Assembly 4 Test Conditions 5 Initial Setup 6 Verification 6 Terminal Block CJC Verification 6 Where to Go for Support 9 Softwa...

Page 2: ...ons and Specifications NI TB 9214 specific information specifications and calibration interval NI DAQmx Readme Operating system and application software support in NI DAQmx LabVIEW Help LabVIEW progra...

Page 3: ...Module Use an NI 9214 module that is verified to be within product specifications Chassis NI cDAQ 9178 BarrierStrip Assembly Thermocouple Wire TT E 24 SLE 100 E type SLE 24 AWG 20 to 30 meters Thermo...

Page 4: ...Crimp the chromel spade lugs to the chromel wire to create 16 positive spade lugs Crimp the constantan spade lugs to the constantan wire to create 16 negative spade lugs 2 Use the thermocouple wire sp...

Page 5: ...I TB 9214 meets published specifications Keep connections to the NI TB 9214 as short as possible Long cables and wires act as antennae picking up extra noise that can affect measurements Verify that a...

Page 6: ...er 6 Connect the power source to the NI cDAQ 9178 chassis 7 Launch Measurement Automation Explorer MAX 8 Right click the device name and select Self Test to ensure that the module is working properly...

Page 7: ...temp0 value a Create and configure an AI Temp Built In Sensor task for CJC channel _cjtemp0 on the NI 9214 according to Table 2 b Configure the AI Temp Built In Sensor task for CJC channel _cjtemp0 ac...

Page 8: ...fore acquiring data Wait at least 300 ms for the Ectron 1140A to settle before acquiring data with the NI 9214 Disregard the first six seconds of the acquisition to compensate for the open thermocoupl...

Page 9: ...at the NI TB 9214 is outside of the limits refer to Where to Go for Support for assistance in returning the device to NI Where to Go for Support The National Instruments Web site is your complete reso...

Reviews: