Figure 2.
Installing NI PXIe-4304/4305
Modules
Connect the Signals
Caution
For EMC compliance, operate this product with shielded cables and
accessories.
To connect signals to the terminal block, refer to Figures 3 and 4 while completing the following
steps:
Note
You can find the pinout names and locations in Measurement & Automation
Explorer (MAX) at any time by right-clicking the device name under
Devices and
Interfaces
and selecting
Device Pinouts
.
1.
Loosen the captive top cover screws and remove the top cover.
2.
Loosen the strain-relief screws and remove the strain-relief bar.
3.
Prepare the shielded signal wire by stripping the insulation no more than 7 mm (0.28 in.).
4.
Run the shielded signal wires through the strain-relief opening.
1
Captive Screws
NI
PXI
e-10
62Q
CO
OLING
CL
EA
RANC
E A
ND
FAN
FIL
TE
R MAI
NT
ENANCE
RE
QUI
RE
D.
S
EE
MA
NU
AL
.
1
Datasheet
Sales:
+44 (0) 1273 570 220
Website:
www.amplicon.com
Email:
IT and Instrumentation for industry
Amplicon.com