10
Every 1000 operating hours (Nardi technician)
Date
Signature
Valve change
Annually or as required
Date
Signature
Perform a breathing air quality check with aerotests
Check blow-off pressure of final pressure safety valve
After repair work
Date
Signature
Check functioning and tightness of filling valve
Clean intake filter and intake filter cartridge
Check tightness of O-rings
After storage and preservation
Date
Signature
Check tightness of all cooler-pipes and couplings
Clean intake filter
Check zero position on final pressure gauge when
depressurized
INSTRUCTION MANUAL PACIFIC 210