
W415-2838 / A / 08.20.20
EN
16
finishing
4.4 bricks and baffles installation
!
WARNING
• Operation of the appliance without the bricks and baffles can result in excessive temperatures that could
damage the appliance., chimney and the surrounding enclosure.
With the appliance and chimney installation
completed, move the bricks into place as
illustrated below
(Fig. 4-5)
.
A.
Install eight “A” bricks and four “B” bricks
along the bottom of the firebox, working
from the back of the appliance forward.
B.
Install eight “A” bricks along the left and
right sides of the appliance.
C.
Install four “A” bricks and two “C” bricks
along the back wall by pivoting the bricks
up under the brick retainer.
D.
Install six “D” bricks along the front of the
firebox.
E.
Carefully pivot the four “E” fibre baffles up onto the secondary air tubes as illustrated
(Fig. 4-6)
. Ensure
that the baffles are pushed all the way to the rear of the firebox, leaving a minimum of a 1 inch gap along
the front. This will allow the flue gases to escape the firebox. Ensure overlap joint is tight.
Fig. 4-6
Place “C” bricks in the centre, with
two “A” bricks on either side as
illustrated
(Fig. 4-5)
.
note:
note:
For further details about brick descriptions and part numbers, see “replacement parts” section.
A
A
A
A
A
A
A
A
C
C
A
A
A
A
A
A
A
A
B
B
B
B
A
A
A
A
D
D
D
D
D
D
E
E
E
E
The fibre baffles are shipped inside the firebox. They must be removed from all special packaging prior to installation.
Secondary Air
Tubes (x4)
Baffles (x4)
Overlap
Joint
Fig. 4-5