7
E
Assemble the reflector pieces to the
middle piece using the small washers and
the acorn nuts.
F
Place a steel washer over each bolt on
the burner top (figure 8)
Lay reflector over the burner top bolts
add another steel washer to each bolt.
G
Install a full gas cylinder on the base.
Connect the gas regulator hose to the QCC1
Cylinder valve by turning the knob clockwise
manually.
Do not use a tool, tighten firmly by hand.
Replace cylinder cover.
LEAK TEST
Now that the heater is assembled, for your safety you must perform a leak test of all
connections and hoses.
Mix in a spray bottle equal parts of water and soap.
1. Ensure that the heater gas control knob is fully closed by turning
completely clockwise
2. Open cylinder valve.
3. Apply generously the solution to all connections and hoses.
Summary of Contents for PTH55PSS-1
Page 11: ...10 PARTS AVAILABLE TO ORDER ...