W415-0919 / D / 03.27.13
30
RIGHT vENT INSTALLATION
NOTE
upflow Vent Right - condensate
trap must be installed on left side.
IMPORTANT:
• PRIME CONDENSATE TRAP WITH
WATER AND CUT DRAIN HOSES TO
PROPER LENGTH.
• CUT PRESSURE SWITCH TUBING
TO PROPER LENGTH.
FIGURE 23 - HORIzONTAL LEFT vENT AND DRAINING OPTION
LEFT vENT INSTALLATION
TOP vENT INSTALLATION
IMPORTANT:
• PRIME CONDENSATE TRAP WITH WATER AND CUT DRAIN HOSES TO PROPER LENGTH.
• CUT PRESSURE SWTICH TUBING TO PROPER LENGTH.
FIGURE 22 - UPFLOW vENT AND DRAINING OPTION CONTINUED