background image

FINALIZING 

EDGE GRINDING 

Eto Naoya 
Managing Director 

-4- 

Oct-29 2014 

Head Office in Japan 

NAKAYA CO.,LTD.

 

1313-92 Yanagisawa, Sanjo, Niigata, Japan 

1. Loosen the screws of [a] Main Unit and remove 
[b] Sub Cover and [c] Half Cover. 
 

2. Switch the position of [b] Sub Cover and [c] 
Half Cover, then tighten screws to secure in 
position. 

3. Start the grinding work in the same process of 
Page 3 "GRINDING". 

[c] 

[b] 

Screw 

[a] 

[c] 

[b] 

Vacuum hose 

* Keep the surface of [c] Half Cover in contact 
with the  wall during work. 

Wall 

[c] 

Summary of Contents for Hurricane NKC-125

Page 1: ... FLEX L3309 125 L3309FR L3309FRG L3410FR L3410VR a Main Unit b Sub Cover c Half Cover d M Connector e H Connector f B Connector g D Connector h F Connector i Collar k Wrench m Base Flange n T4 5 Spacer o T7 3 Spacer p T7 3 x iD16 Spacer q Hose Adapter NKC 125 INSTRUCTION MANUAL WARNING SPECIFICATIONS Only use the correct connector for each angle grinder If any connector does not fit correctly then...

Page 2: ...GWS10 125 GWS11 125CI GWS14 125CI Remove O Ring if it is equipped O Ring INSTALLATION 2 Grinder Guard Take the Guard off from the Grinder T4 5 d Factory Preset e g h f i m m T4 5 T7 3 1 Loosen the screws by k Wrench and remove the preset connector 2 Set the correct Connector and tighten the screws Don t forget to fit the washers Hold 3points of the Connector and tighten the fitting screws 2pls Whe...

Page 3: ... using the flange spanner supplied with the angle grinder Choose correct Spacer which keep X and Y as below X 1 X 5 1 Y Y Spacer n o p m Base Flange Standard Flange Spindle Cup Wheel Wheel Nut Wrench GRINDING Vacuum Hose q Duct 1 Securely connect the Vacuum Hose to the port of a Main Unit using q Hose Adapter or other suitable joint between the port and Vacuum Hose 2 Securely hold the angle grinde...

Page 4: ... 1 Loosen the screws of a Main Unit and remove b Sub Cover and c Half Cover 2 Switch the position of b Sub Cover and c Half Cover then tighten screws to secure in position 3 Start the grinding work in the same process of Page 3 GRINDING c b Screw a c b Vacuum hose Keep the surface of c Half Cover in contact with the wall during work Wall c ...

Reviews: