FINALIZING
EDGE GRINDING
Eto Naoya
Managing Director
-4-
Oct-29 2014
Head Office in Japan
NAKAYA CO.,LTD.
1313-92 Yanagisawa, Sanjo, Niigata, Japan
1. Loosen the screws of [a] Main Unit and remove
[b] Sub Cover and [c] Half Cover.
2. Switch the position of [b] Sub Cover and [c]
Half Cover, then tighten screws to secure in
position.
3. Start the grinding work in the same process of
Page 3 "GRINDING".
[c]
[b]
Screw
[a]
[c]
[b]
Vacuum hose
* Keep the surface of [c] Half Cover in contact
with the wall during work.
Wall
[c]