5-3. Description of Basic Instructions
Basic Instruction Reference
100
5-3. Description of Basic Instructions
5-3. Description of Basic Instructions
101
Outline
ST: Begins a logic operation with a Form A (normally open) contact.
ST/: Begins a logic operation with a Form B (normally closed) contact.
OT: Outputs the operated result to the specified output.
Program example
■
Operands
■
Time chart
■
Explanation of example
• Y0 goes ON when X0 turns ON.
• Y1 goes ON when X1 turns OFF.
Description
• The
ST
instruction starts logic operations and regards the input contact specified at the start as
Form A (normally open) contact.
• The
ST
/
instruction starts logic operations and regards the input contact specified at the start as
Form B (normally closed) contact.
• The
OT
instruction outputs the operation result to a specified coil.
Notes:
Timer/Counter
Contact
C
Relay
T
R
Y
X
Instruction
ST, ST/
OT
A
A
A
A
A
N/A A
A
N/A
N/A
ON
OFF
X0
ON
OFF
Y0
ON
OFF
X1
ON
OFF
Y1
• The
ST
and
ST
/
instructions start from the bus line.
• Some input devices such as emergency stop switch usually have the Form B (normally closed) contact.
When an emergency stop switch with the Form B contact is programmed as input to the FP1, use the
ST
instruction instead of the
ST
/
instruction.
• The
OT
instruction cannot start directly from the bus line.
• The
OT
instruction can be used consecutively.
• Refer to page 141, “3. Duplicated Use of Outputs”, for details about duplicate output of the
OT
instruction.
FP Programmer
II
key operations
ST
Start
ST/
Start Not
OT
Out
Availability
Step
1
1
1
All series
Ladder Diagram
Boolean Non-ladder
Address Instruction
0
X0
Y0
Out
Start
2
X1
Y1
Out
Start Not
ST
X-WX
ST
X-WX
ST
X-WX
0
WRT
OT
L-WL
0
WRT
AN
Y-WY
NOT
DT/Ld
1
OT
L-WL
AN
Y-WY
1
WRT
WRT
ST
X-WX
0
1
2
3
ST
X
0
OT
Y
0
ST/
X
1
OT
Y
1
X0
Y0
Bus line
Y1
Y2
A:
Available
N/A: Not Available
Instruction name
Ladder diagram on
the screen using
NPST-GR Software
Available operands
for instruction
Explanation of
program example and
description of
instructions
Boolean (non-ladder)
with NPST-GR Software
Number of steps for instructions
Available unit type
Key operation of
FP Programmer II
Time chart of
program example
Summary of Contents for FP1
Page 1: ...PROGRAMMABLE CONTROLLER FP1 is a global brand name of Matsushita Electric Works Hardware ...
Page 28: ...20 ...
Page 98: ...90 ...
Page 150: ...142 ...
Page 208: ...200 ...
Page 226: ...218 ...
Page 280: ...272 ...