9. Plumb the Floor Track by hanging a Plumb Bob from the Header.
DN 1014
Header Cover
Plumb Line + 1/8” to edge of Track
4.5”
1/8”
EXTERIOR
Figure 6 Plumb Line
3 .2 Recessed Floor Track
(Full Open)
1. On the Breakout side of building, snap a chalk line on the floor from Jamb to Jamb.
2. Create a channel that is 1/2 inch deep, and 4-1/2 inches wide, and the full length between both Jamb Tubes.
Figure 7 Track Recess
DN 0966
Cut to full
width of system
4-1/2” (2 Panel)
1.75”
1/2”
1/2”
Track
Floor Surface
3. Obtain and then insert the Floor Track (without Channels) on the side of the Pivot Jamb tube.
4. Obtain and then insert the Floor Track (with Channels) on the side of the Strike Jamb Tube.
5. Ensure there are no gaps between the Floor Tracks and the Jamb Tubes.
3 .3 Surface Floor Track
(Fixed Sidelite)
FOR FULL OPEN UNITS SKIP TO
SECTION 5
Note: To avoid misalignment, Do Not permanently secure Floor Tracks until the Slide Door installation is complete.
1. Obtain the Floor Track that was cut to specification at the NABCO Factory.
2. On the Non-Breakout side of opening, snap a chalk line on the floor from Jamb to Jamb.
Figure 8 Snap Chalkline
DN 1015
Jamb Tube
Chalk Line
NONBREAKOUT SIDE
3. Position the Floor Track between the Pivot Jamb tube and the Strike Jamb Tube.
a.
(1) Aluminum Bar has been preinstalled underneath the Floor Track located in the middle. This Aluminum Bar is used to
reinforce the Fixed Sidelite Bottom Bracket.
4. Align the full length of Floor Track so it is flush with the chalk line.
DN 1016
NONBREAKOUT SIDE
Swing Sidelite
Floor Track
Pivot Jamb Tube
Strike Jamb Tube
Slide Door
Figure 9 Floor Track Placement
5. Plumb the Floor Track by hanging a Plumb Bob from the Header.