
17 of 53
www.NabcoEntrances.com
GT1175 (H105 Medium) Hurricane Quick Set-Up and Parts Guide
Rev 8-10-16
P/N C-00106
3. Ensure the Leading Edge of the Slide door and (other Slide door or Jamb Tube) are parallel.
4.
Ensure the Leading Edge of the Slide door and Header are parallel.
5. Retighten the 7/16-20 Whizlock nuts. Do not overtighten.
DN 0895
BIPART
SINGLE
Pa
ra
llel Ga
p
Parallel Gap
Parallel Gap
Pa
ra
llel Ga
p
Parallel Gap
11/16” (17mm) to
15/16” (24mm);
7/8” (22mm)
nominal
Figure 29 Floor Gap
6 .7 Anti-Rise Rollers
Ensure (1) Anti-Rise Bracket is aligned directly above each Anti-Rise Roller.
1. Fully close Slide Door. Ensure each Anti-Rise Bracket is aligned directly above each Anti-Rise Roller. If not, go to the Anti-Rise
Bracket and loosen (1) 3/8-16 Whizlock Nut with a 9/16 inch wrench.
2. Slide the Anti-Rise Bracket to the left or right. Retighten screws. Do not overtighten.
DN 0929
An -Rise Roller
An -Rise Bracket
An -Rise Bracket
An -Rise Roller
3/8”-16 Whizlock Nut
3/8”-16 Whizlock Nut
Figure 30 Align Anti-Rise Brackets to Anti-Rise Rollers
3. Loosen (2) Anti-Rise Rollers located towards the middle of the Carrier. Turn the Axle clockwise until there is a 1/64 inch to
1/32 inch gap between the Roller Wheel and the Top Track.
a.
Gap should be about the same thickness of a credit card.
4. Retighten the 7/16-20 Whizlock nuts. Do not overtighten.
DN 0898
An -Rise
Roller Wheel
Top of Track
1/64 inch to
1/32 inch
clearance
Figure 31 Anti-Rise Roller Wheel and Top Track Clearance
CAUTION