![background image](http://html.mh-extra.com/html/myenergi/zappi/zappi_installation-manual_1862228021.webp)
Page
21
of
51
8.5
Fitting the Cover
Step 1:
Offer cover to the enclosure, ensuring all
cables are neatly secured inside the unit.
•
Take particular care that the ribbon cable is not
trapped between the cover and the case
Ensure O-ring (seal) is firmly placed into the channel
and secure the cover to the unit using the 8 screws
that were removed earlier (Torque setting = 1.2Nm).
Step 2:
Add fascia to the enclosure cover of the
zappi
as shown.
Step 3:
Ensure the 2 tabs at the bottom of the
fascia click to indicate its securely fixed in place.
Step 4:
zappi
is now ready for operation.
Summary of Contents for zappi
Page 7: ...Page 7 of 51 ...
Page 16: ...Page 16 of 51 ...