half an hour.
Part II
1. Detailed Operation
Detailed installation is as follow:
①Jack of Shockwave probe
②Jack of foot pedal
③Switch
④Power
After checking that the instrument is connected properly, the following starting
interface will appear when the power supply is turned on.
The following interface then appears
Summary of Contents for WL-SW6
Page 1: ...User Manual WL SW6 ...