
1
21
Subject to modifications
•
19, rue de Rennes
•
BP 83221 • F - 35690 ACIGNÉ
—
Put the hoses on the front of the implement.
—
Set the implement down on the ground by lightly dumping
to release the implement carrier from the implement.
11. IMPLEMENT HITCHING
This operation must be carried out by the driver, who must leave the seat and ensure
all manoeuvres are forbidden while he is working on the loader.
—
Approach the loader in line with the implement.
— Before taking the implement, make sure that the locks are in
the "open" (1) position to allow space for the implement parts.