23
M1.3.MIG200I-MIG250I-MIG350I.NLFREN 09102018
EN
4.2 Back panel
18. Input power cord
19. Power switch
20. Fan
21.
Gas solenoid inlet fitting
22. Grounding terminal
4.3 Mid-clapboard
23. Burnback time control
4.4 Inside
24. Spool
25. Wire feeder
26. Euro connector
7
20
19
18
21
22
18. Power switch
19. Input power cord
20. Socket of gas regulator heater
21. Fan
22. Gas inlet
23. Burn back time
7
20
19
18
21
22
18. Power switch
19. Input power cord
20. Socket of gas regulator heater
21. Fan
22. Gas inlet
23. Burn back time
8
24
25
26
24.Spool
25.Wire feeder
26.Euro connector
7. Installation & Debugging & Operation
Notice:
Please install the machine strictly according to the following steps.
Turn off the power supply before any electric connection operation.
IP21S enclosure protection grade, please do not operate it in rain.
7.1 MMA Installation
Fig 6 MMA Sketch Map
1. Please connect the primary power line to the according voltage class. Please make sure the power
copyrighted
document
- all
rights
reserved
by
FBC