Buckle installation and usage diagram (figure 4).
6. The wire rope hoist adopts single-phase power supply with rated voltage of 230 V ± 5%, and frequency of 50 Hz ± 1%.
The motor should be appropriately grounded, and power surge protection and leakage protection should be provided in
the power supply circuit.
7.
After switching on the wire rope hoist, the Up and Down switches can be used to conduct empty load test, and confirm
reliable lifting and flexible braking before using with load.
8. The wire rope hoist is equipped with an overheating protection device. If overheating causes the hoist to shut down,
operations can be resumed after the motor cools down to a desired temperature. Therefore, while using the hoist to lift
load, avoid unnecessarily using the Up/Down switch or it may damage the motor.
5 Remote control for SL30040-R
5.1 Installation
• The receiver’s installation site should be away from inverter, motor and their cables to keep from disturbing. The farther, the
better.
•
The receiver should not be installed in the electric cabinet. The correct installation is to fix the receiver on the outside top or
surface of the electric cabinet and connect the receiver cable with the electric cabinet.
• The remote controllers of the series are with 4 billion groups’ safety code and the end products are with different safety
code. Please be sure that there is no product with the same code in the same working zone to avoid malfunction of
disturbing.
• In 20 meters’ zone, there should not be equipments with same frequency channel to avoid mutual disturbing.
5.2 Emergency situation handling
Please handle as following steps and inform the dealer:
1. Press emergency button (STOP).
2. Pull out the key switch of transmitter.
3. Turn off the equipment power.
4.
Inform the dealer to find the reasons.