11
the Inflatable PfD as outlined in the Repacking section (p. 9).
ii) Oral Inflation Valve Test: To check the oral inflation valve, fully
inflate the Inflatable PfD using the oral inflator and hold valve
under water. If bubbles appear, deflate and re-inflate to test again.
Should the leak persist, take your Inflatable PfD to your Mustang
dealer for evaluation and/or servicing.
iii) Perform a thorough visual examination. See
Readiness
Checklist
(p. 3).
Perform these tests more often if exposed to potential damage or
used in extreme conditions.
3)
After Each Inflation -
Re-arm the Inflatable PfD. See Re-arming
Your PfD, p. 7.
4)
Annually -
Perform the following at the beginning of each
boating season, after inflation, or whenever the integrity of the
Inflatable PfD is in doubt:
i) Check all components for dirt or corrosion. Clean or replace, as
neccessary. See
Readiness Checklist
(p. 3).
ii) Visually examine your Inflatable PfD for damage or excessive
abrasion, wear, tear or contamination. Particular attention must be
paid to the stitching, straps and hardware. If in doubt, send it to
your Mustang dealer for evaluation and/or servicing.
iii) Perform the Oral Inflation Valve Test: See the Oral Inflation
Valve Test in the Every Two (2) Months Care and Maintenance
Instructions section.
iv) Perform the Leak Test. See the Leak Test in the Every Two (2)
Months Care and Maintenance Instructions section.
v) Ensure the service indicator is green (fig. 1).
vi) Record as an “Annual” inspection in permanent ink on the
Care and Storage label, in the Date Maintained column.
Repack the Inflatable PfD as outlined in the Repacking section (p. 9).
Summary of Contents for MD3071
Page 22: ......