TL series
2
WARNING! Before carrying out any operations with the unit, carefully read this instruction
manual and keep it with cure for future reference. It contains important information about
the installation, usage and maintenance of the unit.
SAFETY
General instruction
• The products referred to in this manual conform to the European Community Directives and are there-
fore marked with .
• This unit is not for home use, only professional applications.
• This lifter must be installed by trained and qualified personnel only.
• After having removed the packaging, check that the fixture is not damaged in any way. If in doubt,
don’t use it and contact an authorized technical service centre.
• Do not dismantle or modify the unit.
• All work must always be carried out by qualified technical personnel. Contact the nearest sales point for
an inspection or contact the manufacturer directly.
• If the unit is to be put out of operation definitively, take it to a local recycling
plant for a disposal which is not harmful to the environment.
Warnings: safety conditions
During the set up and dismantling operations with the structures, the following directions must be fol-
lowed:
• Operations must be entrusted to qualified people only, provided with physical suitability certificate.
• Proper individual safety devices must be always used, such as:
- safety belts;
- helmets;
- gloves;
- safety shoes etc;
- as specified by the safety plan.
• While managing the operations, responsibility and tasks must be previously defined for each worker
within the team.
• While managing the operations, responsibility and tasks must be previously defined for each worker
within the team.
• Personnel must not be allowed to climb freely on structure without using proper equipment.
• Working area must not be accessed by people not involved in the operations, prearranging a proper
fence and related signals of danger and restricted area.
• Must always be present signals showing risks and precautions to adopt.
• Transit of vehicles and people must always be granted during the execution of the works.
• All construction elements must be verified before their use: faulty materials must be substituted right
away.
• It is necessary to verify periodically: anchoring points, bolt fastening, joints and structure’s elements
condition, especially after soon major atmospheric events.
Not take into consideration these rules could cause the knock over of the tower
or its load, provocating damages in people and properties.
Summary of Contents for Pro Truss TL Series
Page 1: ... Manuale Utente User Manual TL139 TL140 TL152 TL153 TL255 TL265 EN IT TELESCOPIC LIFTERS ...
Page 34: ......
Page 37: ......
Page 38: ......
Page 39: ......