5
© Munters Corporation, August 2018
QM1190r7
2.1 Fan Installation
Step
1
Construct framed opening to correct size according to the Wall Opening listed in chart A below.
See Figure 1A and 1B
Installation Instructions
2.
Minimum Spacing
'Z'
Chart A
Wall Opening
(W. x H.)
Fan Dia.
12” recommended; 10” minimum
12” recommended; 10” minimum
51”
55”
56
1
⁄
4
”W. x 57
3
⁄
4
”H.
60” W. x 61
1
⁄
4
” H.
Figure 1B Post Construction
Figure 1A Frame Construction
Ceiling
Framing
H
(see chart
A)
12"
W
(see chart A)
See minimum
spacing notes in
Chart A
Z
Center To Center
Dimension
66” Minimum
70” Minimum
Top of Post Wall
H.
(see Chart
A)
W.
(see Chart A)
6 x 6 Post - 6'O.C.
'Z'