FORM: QM1070
Rev.3, February 2010
Page 4 of 15
Munters Corporation
4215 Legion Dr. Mason, MI 48854-1036 USA
(517) 676-7070 Fax (517) 676-7078
www.munters.us/aerotech
#14 x 1.5" Lag
Screws [A]
2 x 4 Framing
Figure 2A
OUTSIDE
INSIDE
Step 2
Insert fan into the framed opening from the inside. Place (2) Fastener [D] under the top (2) Fastener [A].
See
Figure 2A.
While lifting fan up tight to framing, fasten top of fan with the (2) Fastener [A] and [D].
See Figure
2B.
Next, fasten bottom of fan, then both sides with remaining (6) Fastener [A]. Install flashing around opening
tight to fan and caulk around fan to seal.
If fan and shutter needs to be mounted flush to inside wall,
See
Figure 3
for framing details.
Step 1
Construct the framed opening to correct size according to Wall Opening on Page 1.
See
Figure 1.
INSTALLATION INSTRUCTIONS
Figure 1
Ceiling
Framing
W
all Opening
(see page 1)
12"
Wall Opening
(see page 1)
12"
Figure 3
2 x 6
Framing
2 x 6 Framing
1 x 6 Framing
34" H. x 33
1
/
4
" W
.
26" Vortex
Fan
Retainer
Clip [D]
#14 x 1.5" Lag
Screws [A]
Retainer
Clip [D]
Fan
Figure 2B