25
© Munters Corporation, August 2022
QM1217r0
Installation Instructions
Chapter 2
Figure 32
Step 34
For the first Drive Pipe [3] with Pinion Gear, slide the swedged end of the Drive Pipe through the Bronze
Bushing in Guide Plate [13] so that the 1 Pinion Gear is on the left side of the Guide Plate [13] in line with
Pivoting Connector.
See Figure 32.
First Drive Pipe [3]
with Pinion Gear
Guide Plate [13]
Pinion Gear with Set Screws
Figure 33
Step 35
For next Drive Pipe [3] slide (1) Pinion Gear onto Pipe, then slide the swedged end of the Drive Pipe through
the next Bronze Bushing in Guide Plate [13]. Then slide the opposite end onto the swedged end of the
previous pipe. If needed slide the Pinion Gear past the joint in the pipes to align with the Pivoting Connector.
Align the pre-drilled holes and secure pipes together using Bolt [D] and Nut [G].
See Figure 33.
Repeat this
step for all but the last Drive Pipe [3].
First Drive Pipe [3] with
Pinion Gears
Bolt [D]
Second Drive Pipe [3] with Pinion Gears
Nut [G]
Swedged End of Pipe