Installation Instructions
Chapter 2
Step 32
For the next Drive Pipe [3], slide the large end over the swedged end of the previous pipe and drill a
¹³⁄₃₂"
dia. hole through the 2 pipes, 1½
" from the end of the large pipe. Continue this for all the pipes in system.
See Figure 30.
Set all drilled pipe aside for later installation. It may be helpful to mark each pipe as it is
drilled so that when they are installed the pipes that are pre-drilled together will be installed together.
Figure 30
126"L. Drive Pipe [3]
126"L. Drive Pipe [3]
Step 33
Install (2) Set Screws [C] in each Pinion Gear [7].
See Figure 31A.
Slide (1) Pinion Gear with Set Screws
onto the first pre-drilled Drive Pipe [3].
See Figure 31B.
Each Pinion Gear will eventually line-up with each
Door Support CHNL Bracket [6].
Figure 31B
Pinion Gear [7]
Set Screws [C]
First Pre-Drilled Drive Pipe [3]
Pinion Gear [7] with Set Screws [C]
Figure 31A
2.11 Drive Pipe Installation