M
ULTI
-C
ELL
I
NSTALLATION
23
Display wall installations
Display wall installations should be planned and implemented keeping in mind
the technical requirements for the heat control of the Cells. Ensure that Cells
located in one ventilation space have sufficient intake of cold air (
typical use for
MT550: 220 m3 / hour / Cell
).
The following example of a 4x3 display wall of MT550 Cells provides general
guidelines for the design process.
Front view
View from right
NOTICE:
Forced air flow is
recommend.