PAGE 120 — MAYCO LS300 CONCRETE PUMP • OPERATION AND PARTS MANUAL — REV. #4 (06/21/10)
LUBRICATION PANEL ASSY.
POSITION
LOCATION
LENGTH OF LINES
A ................................................. CLEVIS GREASE POINT ................................................ 34 in. (1.1 m)
B ................................................. SWING AXLE BUSHING GREASE POINT ...................... 26 in. (.85 m)
C ................................................. PIVOT BRACKET GREASE POINT ................................. 41 in. (1.5 m)
Grease daily, two or three shots of #2
multipurpose automotive grease. Over
greasing any bearing will not damage
the machine. ALWAYS grease
before
and after pump operation.