Startup and Operation
Section 5: Startup and Operation
The SATS is ready to be placed into operation after it has been installed in its enclosure and all input and
output connections have been made. Ensure that AC utility line power is available to the SATS and then
perform the following steps in sequence.
CAUTION
The following steps in these startup and operating procedures MUST be performed exactly as presented;
otherwise, permanent damage to the SATS may result.
For Normal Operation, perform the following procedure:
1. Verify that all connections and initial wiring is complete, as previously outlined and described.
2. Operate the AUTO/Bypass switch to the “AUTO” position.
3. Operate the upstream AC utility line circuit breaker serving the SATS to the ON position.
4. The SATS is now operating in its normal mode, assuming application of appropriate AC line power.
The load is now being powered from AC utility line voltage.
NOTE:
This voltage is not regulated.
5. If an UPS is in use, operate the UPS Input circuit breaker on the SATS to the ON position and then
operate the UPS’ respective input circuit breaker in the ON position. After its initial startup, the UPS
will automatically begin to power the load with regulated voltage.
For Maintenance or Bypass mode, perform the following procedure:
1. Verify AC utility line voltage is present, and the upstream AC utility line circuit breaker is in the ON
position.
2. Place the AUTO/Bypass switch in the “Bypass” mode. The LED shall illuminate when in Bypass mode.
This will disconnect the load from the UPS and power the load directly from utility power.
3. Verify the SATS is maintaining the load with AC utility line voltage.
NOTE:
This voltage is not regulat-
ed.
4. Remove the battery harness from the UPS or operate the DC circuit breaker to the OFF position.
5. Place the AC circuit breaker on the UPS to the OFF position.
6. Place the UPS Input circuit breaker on the UPS to the OFF position.
7. The UPS and battery string may now be maintained by a qualified technician.