
2.10
Milk Room Installations
Ensure proper clearances between the milk cooler and other obstacles or equipment as required by the
regulations in your locality. Special attention should be placed on floor drain locations, high-traffic and
working areas, and ease of access for the operators.
The milk cooler parts box includes two stainless steel brackets to secure the water/chemical fill line to
the rear head of the milk cooler, Part Nos. 8823254 (top) and 8823253 (bottom). Each bracket is
supplied with 1.125" rubber grommets, which provides a method to support the water/chemical fill
hose inside of .75" PVC conduit. See Figure 7.
Figure 7 - Milk Room Installations
Sentry II with Auto-Dosing Assembly Operating Instructions
8
Effective April 1, 2000
Summary of Contents for SENTRY II
Page 2: ......