
1.7 Safety requirements for maintenance and repair work, special
instructions for applications with gaseous fuel
Safety requirements before commencing maintenance and repair work
Installation and connection of the gas supply must only be carried out by a specialized company with
staff that has been trained and authorized for this task.
Have all work on gas-bearing components carried out by authorized, specialized companies.
Shut off the gas supply to the product and activate the emergency stop at the interface switchgear cab-
inet or by turning the key switch (if applicable).
Close the manual shutoff valve for the gas supply.
The coolant pumps must keep running-on for a longer period in the case of scheduled shutdowns.
14 | Safety | MS150108/02E 2015-03
TIM-ID: 0000040549 - 003