![MSSC QM1610 Operator'S Manual Download Page 14](http://html1.mh-extra.com/html/mssc/qm1610/qm1610_operators-manual_1849286014.webp)
3-6 Fast Installation
Rev AE
MSSC QM1610 Operator Manual
3
Attach a stainless steel tube to the aluminium clamp installed in
Step 2.
4
Attach the combined aluminium clamp to the stainless steel tube
installed in Step 3.
5
Attach the vertical stainless steel tube to the combined aluminium
clamp (refer to Figure 3-6).
6
Attach the printer (with the controller) to the vertical stainless steel
tube installed in Step 5.
Note:
Adjust the printhead by loosening the cross clamp with the ratchet
handles.
Note:
The QM1610 printhead should be perpendicular to the product. If
some nozzles are further away from the product than the others, the print
quality will suffer.
7
Install the plastic end-cap on the surface of the stainless steel tube to
protect the production line operator from being hurt.
The installed printer and assembled bracketry are shown in Figure 3-7
on page 3-7.
Note:
After the QM1610 is in position, tighten the bracketry.
4VSHYGXYMHIPMRIW
Figure 3-6: QM1610 Production Line Guidelines
All manuals and user guides at all-guides.com