12
8 Reactor lid
39 Material Charging Port Sealing Kit
40 Bolt
41Retaining ring
42Nut
2.2.8
Installation of Constant-pressure Funnel and Vacuum Gauge
Please install the constant-pressure funnel and vacuum gauge according to figure 2.2.8.
Figure 2.2.8
Installation of Constant-pressure Funnel
1 Pole
2 Rubber bracket
4Constant-pressure funnel
5 Flange
6 Elbow
7 Vacuum Gauge
8 Reactor lid
18Vacuum gauge installation valve
2.2.9
Installation of Discharge Valve
Note
: Make sure the discharge valve(13) is opening before installation, in case of damage to the vessel
body.
Please refer to Figure 2.2.10.
Please see figure 2.2.9, install the flange(5) and retaining ring(43) on the flange port of the
glass vessel(11) and discharge valve(13), put the sealing ring(44) on the flange port of
discharge valve(13), keep them in right position and then tighten the butterfly nut.